Kisumu, a Generation Restoration pilot city, developed a strategy for the Auji River cleanup and restoration, to improve its habitats, protect local species, and benefit nearby communities and the Lake Victoria ecosystem downstream.
About the city
Kisumu has a population of approximately 422,000 residents, while the metro area is home to approximately 1.2 million residents. Kisumu is a port city situated on the shore of Lake Victoria, the second-largest freshwater lake in the world, in central-western Kenya. It has a tropical rainforest climate, with significant rainfall throughout the year. Kisumu is a fast-growing city that is a significant industrial, financial, and service hub, home to key industries such as agricultural processing, sugar, and textiles.
Local challenges
With intensifying climate change, Kisumu is experiencing periods of prolonged drought, as well as increased temperatures and heatwaves. At the same time, Kisumu receives periodic intense rainfall, resulting in rising lake water levels and urban flooding challenges, particularly in low-lying areas, as well as increased risk of mosquito-borne diseases. These challenges, coupled with unsustainable resource use, conversion of green space into agricultural and urban land, and pollution in the form of plastic and solid waste, have degraded the surrounding environment, resulting in challenges including terrestrial and aquatic species extinction, pest proliferation, and habitat destruction.
The specific site of concern for the Generation Restoration project in Kisumu is the Auji River, a tropical urban river that provides water for both domestic and agricultural use in the city. The Auji River, originating in the Kajulu Hills, flows through various informal settlements before discharging into Lake Victoria. Within the river system, Auji Creek is particularly important for its drainage and stormwater management capabilities, spawning areas for fish, and breeding sites for hippos. However, the river and creek have both become severely degraded over time, particularly due to pollution from agricultural runoff from the nearby sugar industry, and sewage and dumping from surrounding communities. Simultaneously, there is proliferation of invasive species, further altering the aquatic environment.
Action through Generation Restoration
The pilot project in Kisumu aimed to initiate ecosystem restoration along the Auji River through revegetation, pollution reduction, rehabilitation, and biodiversity enhancement, to improve habitat, protect local species and breeding sites, and support urban communities’ wellbeing.
The project began with a baseline assessment of the Auji River conditions, including a stakeholder mapping, review of the regulatory context, and site visits. The stakeholder mapping identified the organizations, institutions, and individuals relevant to the project, analyzed their interests and capacities for involvement, and determined roles and responsibilities moving forward. This included informal communities, government agencies, community-based organizations along the Auji River, local and international NGOs, and academic institutions.
Site visits were also carried out along the Auji River, to determine the baseline socio-economic and environmental conditions along the river, including the climate, biodiversity, and pollution challenges present in the river, and existing restoration efforts. This also provided an opportunity for community consultations on the proposed restoration activities. Furthermore, a regulatory analysis to determine the broader context around nature-based solutions in Kisumu was undertaken, noting the regulatory frameworks that would support the project’s long-term success.
Another important preliminary step was the project’s inclusivity analysis. This was essential to ensure that the project team accurately represented the diverse array of stakeholders needed to address the challenges in the Auji River, and that interventions would appropriately address community concerns, particularly among more vulnerable groups. This included focus group discussions, co-design workshops, and the formation of a technical working group, resulting in preliminary project design. The proposed interventions included establishing a green corridor, creating a community tree nursery, implementing clean-up programs, and implementing environmental education programs to build local capacity. Ultimately, this work culminated in a comprehensive plan for future restoration work to be implemented, and for eventual scale-up in other areas of Kisumu.
From there, the project conducted robust stakeholder engagement to raise awareness and spur restoration activities, through four workshops engaging over 350 community stakeholders. Participants included leaders of local grassroots initiatives and landowners, women and youth groups, and community-based organizations. This served not only to raise awareness of ecosystem restoration, but also to encourage further engagement and shared responsibility in the project through knowledge sharing and participatory inputs on project design. Topics covered included tree nursery establishment, nature-based solutions in urban planning and circular economy, and sustainable tourism.
As part of this stakeholder engagement, community members were engaged in various onsite demonstrations in ecosystem protection and restoration activities, including invasive species clearance within and around the Auji River, plastic pollution clean-up in the river, planting of 1500 trees with 80% survival rate and napier grass along a 3-kilometer stretch of the river, and preparation of land earmarked for tree nursery establishment. These activities involved media coverage through social media and were showcased on government websites to increase visibility.
A community tree nursery and composting education center were established through the project, to support afforestation and agroforestry along the Auji River and the surrounding areas. Following consultation with community members and local leaders, a site was secured, and the nursery and center were outfitted with various materials for planting and composting. Managed by a community environmental champion, the project also provided technical capacity building and training on nursery operations, site ecology, composting and organic farming, and pollution control. Once operational, the center then became a site for environmental education among local youth.
To continue and amplify project activities, the project also enabled a roadmap for scaling up nature-based solutions initiatives across four critical sectors within the Kisumu county government. Building on lessons learned from the pilot project and other restoration work, the scale-up strategy focused on evidence-based strategies for expanding successful nature-based solutions models, practical implementation frameworks adapted to local contexts, policy recommendations for institutional strengthening, financing mechanisms to ensure long-term sustainability, and integration approaches that maximize cross-sectoral benefits. As part of this initiative, the project developed a funding proposal to request further financial support for wetland rehabilitation in the area.
Furthermore, a robust monitoring and evaluation framework for the pilot project was developed. The aim was to build local capacity in monitoring and evaluation while ensuring the long-term sustainability of the Auji River restoration efforts. This included the development and monitoring of various key performance indicators, including environmental metrics such as tree cover and invasive species control, as well as social and institutional metrics such as women’s participation and inter-agency coordination. This also outlined key roles and responsibilities of all stakeholders in ensuring effective monitoring and evaluation for the project and ensuring strong and ongoing links to the communities involved with and impacted by the project.
Main outcomes
The pilot project in Kisumu showcased an inclusive approach to river restoration, rooted in robust community participation and comprehensive planning for project scale-up. The project resulted in various tangible restoration activities in the Auji River, including preliminary work to establish a green corridor, integrating tree planting, erosion control, and native vegetation restoration. This was supported through the establishment of a tree nursery and composting center, which not only serves as a physical space by which to support restoration activities, but also provides substantial social benefits. By hiring nursery attendants and compost managers, the project supported green job creation, particularly among women and youth. At the same time, the center’s education programming in conservation methods can stimulate environmental action beyond the project itself.
The project’s inclusivity approach provides a novel framework for ensuring diverse participation and representation in restoration activities, and that marginalized groups derive maximal benefits from the project. Furthermore, the inclusivity analysis enabled various best practices to ensure diverse and inclusive participation in the project, including holding community meetings in neutral spaces, ensuring that all actors involved in the Auji River restoration were adequately informed and involved in the project, and maintaining regular communications with participants throughout the project.
The development of a robust monitoring and evaluation plan provided actionable measures to ensure project progress. Through this plan, the project achieved measurable impacts, including the establishment of 40,000 seedlings in the nursery, engagement of over 350 community members, and training of 30 county staff.